Always install the anchor device so no part of the device is less 2 5 m from the edge of the roof or opening.
Roof anchor installation instructions.
Anchor points are usually installed on the roof and are used to connect lanyards lifelines and other forms of tie off which prevent a worker from falling.
In general roof anchors should be installed on roofs or structures that are made of wood and sheathing.
Not for use as an abseiling point.
Each roof anchor installation must be independently capable of sustaining this load.
Do not stretch during installation.
Installation of this roof anchor must be certified by a qualified person or engineering service.
Continue adding panels until the roof is covered.
Each of our roofing technicians has received extensive training to properly install roof anchors within the rules and regulations of osha.
Lay flat cap nail flat.
Installation guidelines for different slopes categories are listed below.
Both permanent and temporary roof anchor points are available.
2 way roof anchor installation instructions this product is part of a personal fall arrest system.
The users must read and abide by the manufacturer s instructions for each element of the system.
The roof material must be capable of supporting a minimum tensile load of 5 000 lbs.
Roof anchors installed for restraint applications must be attached to a roof member capable of sustaining a static load of at least 3 000 lbs.
Install the panel so that the short lip overlaps the large lip.
More than one roof anchor is installed to a roof structure the strengths given in a or b above must be met at each roof anchors installation point independently.
B install anchordeck synthetic roofing underlayment without wrinkles.
Reliable roofing is a professional commercial roofing contractor that can provide roof anchor installation services in lake zurich il and the north chicago suburbs.
During installation and assembly of the anchor device ensure that the installer is not less that 2 m from any edge or opening.
The silicone will spread and adhere creating a seal.
Applied in any direction permitted by the restraint system when in use.
Slopes 4 12 and more a lay out anchordeck synthetic roofing underlayment horizontally parallel to the eave with the printed side up.
If the material is not able to support 5 000 lbs.
3 0 operation and use.
You may need to cut panels to fit angles using a circular saw with a metal saw blade.
Minimum tensile load a qualified person must confirm that the support structure maintains a safety factor of two as per osha 1926 502.